Summary

Project name: Shell Cove Road Staircase Renewal

Location: Public beach access staircase between 8 and 10 Shell Cove Road, Barrack Point

Contractor: Dynamic Civil Pty Ltd

Status: Upcoming

Timeframe: 14 September 2026 to late October 2026 (weather permitting)

About the Project:

Shellharbour City Council is undertaking works to repair the structure supporting the public beach access staircase and reconstruct the staircase located between 8 and 10 Shell Cove Road, Barrack Point. 

The retaining wall supporting the staircase has deteriorated and the staircase was closed to protect public safety. 

The project will deliver a new reinforced concrete staircase and stabilise the retaining wall, providing a safe, durable and long-term solution for this important public beach access point. 

Key features of the project include: 

  • Stabilisation of the existing retaining wall 

  • Construction of a new reinforced concrete staircase 

  • Installation of stainless steel handrails 

  • Installation of tactile ground surface indicators 

  • Site restoration following completion of works 

Once complete, the project will restore safe public access to Blacks Beach while improving the functionality and longevity of this important community asset. 

Project Benefits 

  • Restores public access to Blacks Beach. 

  • Improves safety for residents and visitors. 

  • Replaces aging infrastructure with a durable long-term solution. 

  • Improves the functionality and appearance of this important community asset. 

Timeline

Investigation and Design - Complete 
Council inspections identified deterioration of the retaining wall and specialist engineers were engaged to assess the structure and develop remediation options. 

Tender and Contract Award - Complete 
Dynamic Civil Pty Ltd has been appointed to deliver the works. 

Construction - September to October 2026 
Construction is scheduled to commence on 14 September 2026 and is expected to take approximately six weeks to complete (weather permitting).  

Project Completion - Expected October 2026 
Following construction and final inspections, the staircase will reopen to the community. 

What to expect during construction

To safely complete the works, the following impacts can be expected: 

  • The staircase will remain closed for the duration of construction. 

  • No public access will be permitted within the construction area. 

  • Construction vehicles will access the site from Shell Cove Road. 

  • Temporary traffic management may be required at times to facilitate the movement of construction vehicles and concrete deliveries. 

  • Nearby residents may experience increased construction activity, vehicle movements and noise during work hours. 

Construction hours 
Monday to Friday 
7am to 5pm 

Access and detours

The existing staircase providing access to Blacks Beach will be closed throughout construction. 

Alternative beach access points should be used during this period. Please refer to the detour map below for alternative access routes.

Alternative access:

FAQs

 

Why are these works being undertaken?

The structure supporting the staircase has deteriorated over time and requires repairs. The project will improve safety and restore public access to the beach. 

How long will the staircase be closed?

The staircase is expected to be closed for approximately six weeks while works are completed. 

Will there be traffic impacts?

Temporary traffic management may be required on Shell Cove Road during certain stages of construction, particularly when large vehicles and concrete trucks are accessing the site. 

Will nearby residents be affected?

Residents near the work area may experience some construction noise, vehicle movements and contractor activity during work hours. Council and the contractor will work to minimise disruptions where possible. 

When will the staircase reopen?

The staircase is expected to reopen in late October 2026, subject to weather and construction conditions. 

Contact Information

Have questions or want to learn more about this project?
Name: 
Projects Team
Phone: 
02 4221 6111
Last updated : Fri 4 Sep 2026